How does sampling work with an overseas apparel factory?
A step-by-step guide for brands, distributors and team dealers: the sample types, what to send, how approval works, realistic timelines, and how to stop a good sample turning into a different bulk order.
Published 3 November 2026 · Blackthorn World
In short
Sampling with an overseas apparel factory usually runs in three stages: a development (proto) sample built from your tech pack, a pre-production sample in the approved fabric, trims and decoration, and bulk production checked against that sealed sample. At Blackthorn World a pre-production sample takes 15–20 working days and bulk follows 3–4 weeks after approval. Development samples are charged per style plus courier, and the cost is credited against your first bulk order.
For a sourcing team, the sample is the contract in physical form. Price, fabric, fit, color and decoration are all agreed on paper, but the approved sample is what the factory builds to and what your QC team checks against. A disciplined sampling round costs a few weeks up front and saves far more in rework, chargebacks and missed season launches.
The three sample stages
| Stage | Purpose | What you approve |
|---|---|---|
| Development (proto) sample | Turn the tech pack or reference into a first garment | Pattern, construction, overall look and fit direction |
| Pre-production (PP) sample | Build the style exactly as bulk will be made | Final fabric, colors, trims, labels, decoration and graded fit |
| Bulk / top-of-production check | Confirm bulk matches the sealed PP sample | Measurements, color and workmanship against the approved sample |
Not every program needs all three. A reorder of an existing style can usually skip development and go straight to a PP or even direct to bulk against the stored sample. A brand-new outerwear line, such as a private label ski jacket, often needs two development rounds before the PP sample.
What to send before the factory cuts anything
The quality of the first sample depends on the quality of the brief. Send as much of this as you have:
- Tech pack or reference garment. Flat sketches, a measurement spec with tolerances, and construction notes. A physical reference garment is often faster than a written spec for fit.
- Fabric and GSM. Composition, weight and finish (for example, moisture-wicking polyester interlock for sublimated jerseys, or brushed-back fleece for hoodies).
- Artwork. Vector files (AI, PDF or EPS) with Pantone references. For full-print teamwear, mock the colorway in the kit builder first.
- Decoration method. Sublimation, embroidery, screen print, heat transfer or silicone/TPR. Our sublimation vs screen printing guide covers the trade-offs.
- Trims and branding. Zips (brand and gauge), woven neck labels, care labels, hangtags and polybag spec.
- Size set needed. One base size for development, then a graded set (for example S, M, XL) if you are running youth and adult or a wide size range.
Blackthorn World builds patterns in-house on Gerber AccuMark, so your graded patterns are stored and reused on every repeat order.
Timelines you can plan around
A pre-production sample takes 15–20 working days from confirmed artwork and fabric. Bulk production then takes 3–4 weeks after you approve the sample, plus freight by courier, air or sea. Add one to two weeks for each extra development round if the first proto needs pattern changes.
Working backwards from an in-store or season-start date is the safest approach. For a fall team season or a winter retail drop, most buyers lock sampling 10–14 weeks before the delivery date. Our varsity jacket lead-time planner shows the same back-scheduling logic for outerwear.
Sample costs and how the credit works
Development samples are charged per style plus courier. The sample charge is credited against your first bulk order of that style, so on a program that goes to production the sampling cost is effectively recovered. Ask for the sample charge on your quote alongside the bulk price so your costing sheet carries both.
Minimum order quantities apply to the bulk order, not the sample: 30 pieces per design for sublimated wear, 50 pieces per style for cut-and-sew garments such as varsity jackets, hoodies and workwear, and 100 pairs per style for gloves, with sizes mixed.
How to review and approve a sample
- Measure, don't eyeball. Check every point of measure against your spec and tolerance, on a flat table, before anyone tries it on.
- Fit on a real body. Fit on your base-size model, in the activity the garment is made for. A soccer jersey (see our soccer kits) and a hockey jersey move very differently.
- Check color in daylight. Compare against your Pantone or lab dip under D65 or daylight, not office lighting.
- Wash test. Wash per the care label and recheck shrinkage, print adhesion and embroidery puckering.
- Write comments on the sample. Send one consolidated comment sheet with photos and measurements. Mixed feedback from several people slows the next round.
- Seal it. Once approved, sign and date the PP sample and keep one with you. The factory keeps the counter-sample as the bulk standard.
Keeping bulk true to the sample
Most problems between sample and bulk come from changes nobody wrote down: a substituted fabric lot, a different zip supplier, or a print file re-exported at a different size. Agree in writing that any change to fabric, trims or artwork goes back for approval. Ask for a top-of-production photo set with measurements before shipment, or appoint a third-party inspector. Blackthorn World works under an ISO 9001:2015 quality system; see our certifications and the factory video to see the production floor.
If you are comparing suppliers, sampling is also the best test of who you are really dealing with. Our guide to direct factories vs trading companies explains what to look for.
How to start a sample with Blackthorn World
Email your tech pack or reference images, target quantities per style, fabric preference and delivery country to Sales@Blackthorn-textile.com or WhatsApp +92 334 096 2222. We reply with fabric options, a costing, the sample charge and a sample plan. The full process is on how to order.
FAQ
How long does an apparel sample take from an overseas factory?
At Blackthorn World a pre-production sample takes 15–20 working days from confirmed artwork and fabric. Each additional development round, if pattern changes are needed, adds roughly one to two weeks. Bulk follows 3–4 weeks after sample approval, plus shipping.
Do I have to pay for samples?
Yes. Development samples are charged per style plus courier. The sample charge is credited against your first bulk order of that style.
What is the difference between a proto sample and a pre-production sample?
A proto (development) sample tests the pattern and construction, often in substitute fabric. A pre-production sample is made in the final fabric, colors, trims and decoration, exactly as bulk will be produced, and becomes the sealed standard for the order.
Can I skip sampling on a reorder?
Usually, yes. If the style, fabric and artwork are unchanged, bulk can be produced against the stored approved sample and patterns. Any change to fabric, trims, fit or artwork should go through a new pre-production sample.
What should I send to get the first sample right?
A tech pack or reference garment, a measurement spec with tolerances, fabric and GSM, vector artwork with Pantone references, decoration method, trim and label details, and the sizes you want sampled.